Building and Rebuilding

Steve Slusser (Kitty) arrived May 1, 2000 as the new Administrative Director.  It would be after summer before a temporary maintenance man could be hired (Don B), and by Summer 2002 Ralph and Lucy had joined them.  They shared the duplex for the next twenty years.


The first project was the swimming pool.  It was completed in time for Junior Camp.  The photo above was after summer at the Pool Dedication.



Before the next summer the kitchen was completely remodelled and plans for two new cabins were being discussed. In the midst of this the camp was hit by back-to-back hurricanes.  Both docks were destoyed and replaced while working on cabin permitting.  The new cabins opened in 2008.


 